2025 Upgraded Wireless Dog Fence, Dog Training, No-Go Zone, 3-in-1 Precision Radar Electric fence for dogs, Coverage up to 1 Acre, Real-Time Distance Monitoring, Indoor & Outdoor, Medium & Large Dogs

2025 Upgraded Wireless Dog Fence, Dog Training, No-Go Zone, 3-in-1 Precision Radar Electric fence for dogs, Coverage up to 1 Acre, Real-Time Distance Monitoring, Indoor & Outdoor, Medium & Large Dogs

$347.99
Skip to product information
2025 Upgraded Wireless Dog Fence, Dog Training, No-Go Zone, 3-in-1 Precision Radar Electric fence for dogs, Coverage up to 1 Acre, Real-Time Distance Monitoring, Indoor & Outdoor, Medium & Large Dogs

2025 Upgraded Wireless Dog Fence, Dog Training, No-Go Zone, 3-in-1 Precision Radar Electric fence for dogs, Coverage up to 1 Acre, Real-Time Distance Monitoring, Indoor & Outdoor, Medium & Large Dogs

$347.99

About This

  • 【Wireless Dog Fence System, Dog Training, Forbidden Zone 3-in-1】Use radar technology to establish boundaries, not affected by GPS signal limitations, and ensure accurate real-time distance monitoring of your pet indoors or outdoors. Can be used as a long-range static training collar, and has a restricted area function,while keeping stubborn dogs away from sensitive zones, saving you additional costs.
  • 【No Digging, Hassle-Free, Radar Wireless Fence System With Up To 1-Acre Coverage】Forget the need for digging holes or expensive traditional fences. The PETHEY wireless dog fence system offers easy set up using radar technology to create boundaries covering up to 1 acre (10-120 ft in an open area).
  • 【Portable Dog Fence, Take It Wherever You Go】 The F900plus wireless dog fence collar is compact and lightweight (only 0.66lb), making it perfect for travel or moving. Ideal for multiple dogs, rural/suburban homes, and those who frequently travel.
  • 【Safe and Humane Dog Training System, Eliminate Bad Behavior】Pethey F900plus dog training collar features 3 humane training modes with adjustable beep(1 level), vibration(1-8 levels), static stimulation(1-16 levels), Stop unwanted behaviors.
  • 【Forbidden Zone System: Curbing Destructive Dogs】You can creates a circular no-entry area, centered on the transmitter with a radius of 5ft to 15ft. If the furry kids enter this area, the collar emits a warning to deter them.
  • 【Quick Charge, Ipx7 Waterproof Wireless Dog Fence System】The Wireless Fence System With One Receiver Collar That Fully Charges In 3 Hours.The dog fence collar works for a long duration—20 hours/3-5 days (4 hours/day) on a full charge. Ipx7 waterproof collar lets dogs play freely in the pool or rain, The adjustable collar is suitable for extra-large, large, and medium-breed dogs. Dog neck size from 9 to 26 inches, dog weights from 20 to 110lb.

You may also like